English

Arbeitsgruppen und Lehrstühle

Forschung

Studium und Lehre

Allgemeines

Home

Suche

Fakultät für Informatik

 

EMSIG - Level 3

Material Flow Intervention


The stress based decision making does not bring the effect expected. Especially, if only a few workers with the same qualification are in the system the work load of the workers can not be reduced significantly. That's why other possibilities to intervent the material flow were investigated. In the third level the EMSIG basic module is extended by the ergonomic evaluation component.

his component determinates stress dependent waiting times for workers who are overloaded (that is their workload exceeds a certain value). The length of this waiting time is necessary for the relevant worker to come back to a normal workload factor. EMSIG returns the stress dependent waiting time to the simulator via the programming interface. The simulator can use this time to set a worker for the duration of the waiting time not available in the disposition.


Go to :



Webmaster  -